Cryostat:
- new safety at flow meter (w/ burst disk - see dwg. in Giles' files)
- microphonics problem observed during high capillary flow:
- new alcatel 2015 for dual-pump scheme
- new needle valve for dual-pump scheme
- install new hard-stop metal valve for SPARO pumpout
- install new electrical feedthru? Then there is a spare and also can
disconnect thermometry during observations in the event of pickup
- ask polar ops to purchase alcatel 2015
- ask polar ops to purchase gas regulators
- get ready to bring back KF, etc. Get NSF or polar ops to replace
Electronics:
- spare fibers - also spare short fibers inside blue box
- get new batteries soldered up
Optics:
Software:
- backup everything - system stuff too
- test everything (esp with new server)
- test remote writing of data to unix box as Greg did in winter '00
- test backups
ACBAR/SPARO stuff:
- help with Web-based inventory (test with SPARO first)
- get back N.U.'s calibrated leak for leak-checker
Documentation, Inventory, Winter-over training:
- inventory
- winter-over training: - help in disassy./cooldown
- winter-over training: - help in SPARO tests.
Misc: