basic upgrades and
maintenance (Giles, Hua-Bai)
- add camera to view tertiary (see separate folder; see also
"computers") (ORGANIZE THIS FROM POLE)
- see separate folder with info
- buy camera plus spares in US
- Matt (or Greg?) can integrate into our system at S. Pole
- we can use video and heater cables intended for focus motor
- maintenance on cryostat and associated systems
- replace red-handled valve with cold-tested valve (DONE - TEST AT
POLE)
- develop plan for on-telescope warming to 100 K (DO AT POLE)
- need insulated pump-box at plank,
probably in box and with minimal instrumentation
- think through what is
involved in a very long fill (few hrs.) during winter
- charcoal heater controlled by TTL. Then timbuktu could be used to
turn heat off remotely (but X-10 can also do this so its optional)
(ORDER MORE X-10 FROM POLE: MATT N. CAN BRING)
- new spare pumped pot line - much shorter but same fittings at
both ends (from control room out) (NOT THIS YEAR)
- order soon: 6 week lead time?
- build a snout cover for use during installation of SPARO (AT POLE)
- get more of those fill-tube seals that work in cold for outdoor
transfers (ORGANIZE FROM POLE)
- maintenenace on cabling
- fix the cable that broke during the accident in late summer 01-02
- check logbook to see which it was and if repaired already
- a/d battery cable for indoor testing (NOT THIS YEAR)
- new data system analog patch (NOT THIS YEAR)
- better ways to test 18-6 - we have female on both ends of cable (NOT
THIS YEAR)
- plan for indoor test of AD590 (NOT THIS YEAR)
- need more short fibers for inside of blue box (I THINK WE HAVE SPARES)
- need three extenders for heater cable (?) (MARK SAYS THIS WAS DONE)
- maintenance on electronics and related systems
- new data system and preamp batteries - need to arrange shipping
(HAVE BEEN SHIPPED OUT)
- new D-cells for preamps (install or merely check?) (DONE)
- UPS for SPARO Mac and labview PC (ask Dave where to get) (DONE)
- new blue power supply with working current meter (NOT THIS YEAR)
- other
- buy bigger wheels for existing cart (ask Mike W.; 1 foot?)
(MCMASTER - DO FROM POLE)