|
|
Fig 1 - SPARO heat switches: Charcoal pump heat switch (green) is at 11 hours. Helium-3 pots heat switch (red) is at 4 hours. |
|
|
Fig 2 - Location of one of the two green-knobbed valves is shown. One is on the guard 3He stage, and one is on the detector 3He stage. |
|
|
Fig 3 - Lab Breakout Box and Si Diode Current Source Box |
|
|
Fig 4 - how to connect the lab breakout box to the cycling connector on SPARO. |